The erection of scaffolding and edge protection with HM painting for the re-paint of New World Wakatipu.
REQUIREMENTS:
Access for painters to all areas inaccessible by scissor boom
Scaffolding above glass roofs (above pedestrian access)
Scaffolding a clock tower with old brittle tiles
Minimising impact on the operations of New World
COMMENTS:
Everything went to plan with the erection of the scaffolding. The weather (rain and snow) slowed down progress but we still managed to have the entire job completed with half a day spare from our initial time frame