DJI0864-Gradient-BG-4.jpg

KEEP

LOOKING

UP

HAAST HOTEL

QUEENSTOWN

The Haast Hotel required a re-roof that required Ultimate Protection to provide edge protection. 


The edge protection was installed in one day, allowing the roofers to get to work immediately.